Built on trust, high standards of service, quality and customer satisfaction.
Maintaining quality workmanship in a safe and healthy working environment.
Customers have been very pleased with Doug's personal and professional approach to the projects and he has always strives to achieve the highest possible standards at all times, together with meeting targeted completion date. Our traditional "know how" and a propensity for alteration has enabled us to do our services in the best possible way.
New Beach Caravan Park in Dymchurch
Groundworks for New Beach Caravan Park in Dymchurch for Park Evolution
New Bases, Drainage, Services, Paving , Roadworks , & Top Soiling
Works started immediately after Christmas and will continue until March 2021
Office Refurbishment in Tenterden
Office refurbishment in Tenterden
​
Office refurbishment in Tenterden being carried out to conform to current Fire and Safety Regulations.
New Entrance Door Screen with Glazed Sidelights
New Playground at Treetops Nursery Deal
Before
Works started at Treetops Nursery in Deal.
​
New Playground area at Treetops nursery in Deal.
An overgrown area turned into a Nursery Playground in a little over 3 weeks for Kent County Council
New Playground at Treetops Nursery Deal
After
Works completed at Treetops Nursery in Deal.
​
New Playground area at Treetops nursery in Deal.
An overgrown area turned into a Nursery Playground in a little over 3 weeks for Kent County Council
Works involved site clearance, Demolition, New Fencing , Tarmacing Works, Topsoiling and Seeding in Spring
New Beach holiday park in Dymchurch
Works are nearly completed at New Beach Holiday Camp at Dymchurch for Park Evolution.
Works have involved new concrete bases, foul drainage, services, roads, drives, topsoiling & turfing.
The weather has been against us with the “exceptionally inclement weather“ for 4 months, but we stuck to the task in hand and met our contractual obligations to our Client.
We now move on to their next project in Birchington & Sevenoaks.
New Beach holiday park in Dymchurch
Works at New Beach holiday park in Dymchurch.
​
Works ongoing in somewhat appalling winter conditions.
Ahead of the client program even so.
New Caravan bases, drainage, services, and roadwork.
Woodchurch
Work in progress...
Harvester
Preparation work in progress prior to tarmacking works on the new car parking area. White lining works to follow tomorrow. New fencing, garden patio & porch.
Target completion in two weeks. Finished project on time. Workforce working well in cold winter conditions to meet Harvey Shopfitters' program.
New Garden Room
New Garden Room to existing Barn Conversion in Betsham.
Near Ebbsfleet Kent.
We are now watertight and fitting panoramic doors installed. We are ready to commence internal finishing works. Works on the vaulted ceilings are on going this week. Garden room extension started mid April. Completion in a weeks time.
​
Target completion date mid July Approx 12 week overall programmed of works. Client very pleased to date.
Butterflies
In March 2017 we bought Butterflies an old 1970's bungalow in need of full refurbishment. Planning permission and Building Regulations were quickly obtained from KCC to improve its access and build two extensions to the existing building.
We carried out a total refurbishment of the property including "Windows, Heating, Flooring, Kitchen, Bathrooms, Floor Coverings, new drive entrance, Fencing, Patio and Soft Landscaping", all within 12 weeks. The property was then marketed and sold in March 2018.
Tankerton near Whitstable
Work in progress at Tankerton near Whitstable for Park Evolution.
Our work includes installation of New Drainage and Roadworks ready for Tarmacing.
Client happy with our progress and looking to achieve their Target completion date
​Rye
A new build extension at the side of the former Cemetery Keepers Cottage.
High standards of liaison and customer satisfaction were achieved and occupation
took place on programme.
All works inspected and passed by Local Architects and
East Sussex Building Control.
​Bethersden
In 2014 we acquired a piece of land in Orchard Field Bethersden. It was the former
home of the Doctor's Surgery. Planning permission was in place to build a modern and stylish two bedroom detached bungalow of Timber Framed Construction.
Works were completed within six months and sold in September 2014.
The bungalow also benefited from a full 10 year LABC Guarantee.